Bulk waste collection will return from 2 November – 11 December 2026. If your household pays for a Council waste service, you can take advantage of this free opportunity to clear out bulkier waste items by placing them kerbside for collection.
The Jerrys Plains Recreation Ground free camping area will be closed from Monday 7 September 2026 for approximately 16 weeks for improvement works. We apologise for any inconvenience.
Singleton Gym + Swim is a premier aquatics and leisure centre consisting of a seasonal 50m outdoor swimming pool, an outdoor feature/toddler pool, a indoor heated 25m pool, a 12.5m indoor heated programs pool, a hydrotherapy pool sauna and spa.
In 2023 a mechanical audit was completed, identifying a variety of upgrades, repairs and replacements required onsite.
Additionally, the 25m pool water filtration system at the facility requires servicing and upgrades to meet current standards and improve efficiency.
Upgrades completed in the 2023/2024 financial year (stage 1) included installation of an Atlas UFF PCT 250 filter, replacement of two recirculation pumps with VSDs, ultrasonic level sensing and replacement of the mechanical switchboard. 200mm PVC pipework has been installed for soiled water and filtered water return lines.
The Singleton Gym + Swim Mechanical Upgrades Project is entering its final phase, with the wading pool soon to have its own dedicated filtration, chemical dosing, and heating system – separate from the 25m pool.
Upgrades to the spa and hydrotherapy pool are now complete.